MigrateLab
Get yours
A tower crane over a steel frame at dusk

Heavy commercial builds, on schedule.

Girderline Contracting. Commercial, industrial and civil work across the Harlan industrial corridor, with our own steel, concrete and site crews.

delivered since 1996
2.4Msq ft
bonding capacity
$310M
three-year average
0.71EMR
without a lost-time incident
1,400days

Six things we do ourselves.

Self-performing the critical path is how we control schedule, safety and cost.

01

Commercial

Ground-up retail, office and mixed-use from 20,000 to 400,000 square feet. Design-assist or hard bid.

02

Industrial

Distribution centres, cold storage, manufacturing. Tilt-up, pre-engineered metal and structural steel.

03

Civil and heavy

Bridges, culverts, retaining structures and DOT work. Prequalified in three states.

04

Structural steel

Self-performed erection with our own ironworkers and cranes up to 300 tons. No waiting on a sub.

05

Concrete

Foundations, slabs, tilt panels and elevated decks. Night pours when the schedule demands it.

06

Site work

Mass excavation, utilities, paving. Forty pieces of iron in the yard, all of it ours.

Recent projects.

Harlan Logistics Hub
01

Harlan Logistics Hub

Distribution centre, 420,000 sq ft, $48M, delivered 11 weeks early

Tilt-up walls, 40-foot clear height, 96 dock doors. Steel and concrete self-performed, which is how we bought back the schedule.

Northfield Cold Storage
02

Northfield Cold Storage

Industrial, 180,000 sq ft, $61M, minus 20 degree freezer bays

Slab poured at night to hold tolerance in summer heat. Insulated panel envelope and ammonia refrigeration coordinated in-house.

Route 9 Overpass
03

Route 9 Overpass

Civil, DOT, $23M, two-span steel girder bridge

Girders set over a live highway in four overnight closures. Zero incidents, zero missed closure windows.

Everyone goes home. Every night.

Our low EMR lets us bid the jobs where the owner reads the safety section first. Figures shown are sample values for this concept.

0.71
Experience modification rate
1.2
Total recordable incident rate
100%
Field staff OSHA 30 certified
52
Toolbox talks a year, every crew
An excavator on a graded site

Forty pieces of iron. All ours.

  • Crawler cranes to 300 tons, hydraulic cranes to 120 tons
  • Excavators, dozers, scrapers and rollers for mass grading
  • Concrete pumps, screeds and our own batch trucking
  • Two certified welding rigs per steel crew, in-house CWI

From plans to iron on site in 24 days.

  1. Day 0

    Plans in

    Send drawings and a bid date. We confirm scope the same day.

  2. Day 5

    Takeoff done

    Quantities, subs priced, self-perform priced. Questions back to you in one list.

  3. Day 10

    Firm number

    A bid you can build a budget on, with alternates and a schedule attached.

  4. Day 24

    Mobilized

    Two weeks from award to iron on site. Bonding and insurance already in hand.

Repeat clients

  • Harlan Port Authority
  • Northfield Cold Co.
  • Meridian Logistics
  • Stateline Energy
  • Vantage Retail Group
  • Kestrel Data Centers

Client names are sample values for this concept.

A site crew at the morning briefing
An ironworker welding a beam connection

Ironworkers. Operators. Foremen. Start Monday.

Union scale, full benefits from day one, and a superintendent who has swung the same tools you have. Fourteen open roles right now.

See open roles

Request a bid.

Send the drawings and a due date. An estimator replies within one business day.

(555) 014-1996

Estimating desk, 6am to 6pm weekdays